You can download Director's Order FS-072-06-R8 - Here (http://www.hvactechgroup.com/files/order/fs072068.pdf)
QuoteThis order is effective October 15, 2012 and expires on December 1, 2012 when replaced by the Gaseous Fuels Code Adoption Document.
The B149.1-10 Natural Gas and Propane Installation Code takes effect in Ontario, December 1, 2012. You can download the Gaseous Fuels Code Adoption Document FS-200-12 - Here (http://www.hvactechgroup.com/hvacforum/index.php?topic=1116.0)
TSSA forgot to include the Schedule A Owner/User Information Sheet, Schedule B Boiler Inspection Tag and Schedule C Depressurization Test for the second year in a row. You can download the 2010 package - Here (http://www.hvactechgroup.com/files/order/fs072066.pdf)
The TSSA re-posted Director's Order FS-072-06-R8 with the Schedule A Owner/User Information Sheet, Schedule B Boiler Inspection Tag and Schedule C Depressurization Test. Download it - Here (http://www.hvactechgroup.com/files/order/fs072068a.pdf)
*UPDATE 2014* - This Order has now been added to the B149.1-10. See Clause 4.25 and Annex M.